Gain-scheduled control of a tower crane (verification test of an actual tower crane)

Takaaki Nishikawa, Susumu Shimoda, Hidekazu Nishimura, Kouji Tanida

研究成果: Article査読

1 被引用数 (Scopus)

抄録

A crane mounted on a tower-like flexible structure called Tower Crane has a problem that fast transfer of the load causes the sway of the load and the vibration of the flexible structure. Our objective is to reduce both the sway and the vibration using the controller for motors which drive the boom, while an operator gives some commands to transfer the load. We have proposed the gain-scheduled H control method to design the controller, and have already shown its efficiency for a onethirty fifths scale model of the tower crane. In this paper the controller for an actual tower crane is designed and implemented in the existing control system and its effectiveness is verified from the experimental results.

本文言語English
ページ(範囲)1155-1162
ページ数8
ジャーナルNihon Kikai Gakkai Ronbunshu, C Hen/Transactions of the Japan Society of Mechanical Engineers, Part C
76
765
DOI
出版ステータスPublished - 2010 5月
外部発表はい

ASJC Scopus subject areas

  • 材料力学
  • 機械工学
  • 産業および生産工学

フィンガープリント

「Gain-scheduled control of a tower crane (verification test of an actual tower crane)」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

引用スタイル